Council OKs $8,509,830 state loan for main wastewater plant design work
Official title: Authorization For Up To $8,509,830 Step II Loan From Vermont Clean Water State Revolving Fund, For Amended Engineering Contract With Wright Pierce For Up To $6,343,550, For Consultant Contract With PC Construction For Up To $1,126,480, And For Consultant Contract With Stantec For Up To $396,000, For Main Wastewater Plant Improvements (Stage 1)
The Board of Finance resolution lets Public Works apply for a Step II loan of up to $8,509,830 from the Vermont Clean Water State Revolving Fund. It pays for final design of Stage 1 upgrades at the main wastewater plant, including contracts with Wright-Pierce, PC Construction and Stantec.
- IntroducedSep 28
- Board of Finance
- PassedOct 5
The council approved it on Oct. 5 as part of its consent agenda, which the minutes record as unanimous.
Who does this affect?
Wastewater customers, since the loan is repaid from net revenues of the city's wastewater system. The work is for upgrades to the main wastewater plant.
What does it cost?
The loan is up to $8,509,830, which raises an earlier $2,192,700 loan authorization. Contracts are up to $1,126,480 with PC Construction and up to $396,000 with Stantec. The standard terms for this kind of state loan are up to 10 years at 0% interest.
When does it take effect?
The documents do not say.
- Oct 52026
- Sep 282026
- PDF2026.10.05 DPW Resolution re WWTF Stage 1 Final Design Contracts78 KB
- PDFBOF-CC Memo WWTF Stage 1 Final Design 9-28-26 v33.5 MB
- PDFChecklist_2025 Board of Finance and City Council130 KB
- PDFCC Fall 2026 WWTF Updates and CMAR Procurement Status (1)13.6 MB
- PDFSigned CC Resolution Authorization for Step II Loan from Vermont Clean Water State Revolving Fund2.6 MB
- PDFBOF Fall 2026 WWTF Updates and CMAR Procurement Status13.6 MB
Related
- On the agendaMoney & taxes
Authorization For Up To $2,192,700 Step II Loan From Vermont Clean Water State Revolving Fund And For Amended Engineering Contract With Wright Pierce For Up To $2,192,700 For Main Wastewater Plant Improvements (Stage 1)
- PassedStreets & transit
Authorization For Up To $518,600 Step II Loan From Vermont Clean Water State Revolving Fund, For An Engineering Contract With Wright Pierce For Up To $70,000 And For An Amended Engineering Contract With Stantec For An Additional Amount Up To $50,000 For The Upsized Sewer On Cherry Street Project
- PassedEnvironment & energy
Council takes up $1,790,700 state loan for Manhattan Drive stormwater repairs
- PassedEnvironment & energy
Council authorizes up to $2,604,600 state loan for Cherry Street sewer upgrade
- PassedEnvironment & energy
Council OKs $650,000 state loan to study Burlington's water treatment plant
- On the agendaEnvironment & energy
Council authorizes $544,000 state loan for water distribution and storage planning
- PassedMoney & taxes
Authorization For $1,808,000 Construction Loan From Vermont Drinking Water State Revolving Fund For Upgrade Of Distribution System
- PassedStreets & transit
Council authorizes up to $2,033,000 state loan for Cherry Street water main work