On the agenda
Authorization For Up To $2,192,700 Step II Loan From Vermont Clean Water State Revolving Fund And For Amended Engineering Contract With Wright Pierce For Up To $2,192,700 For Main Wastewater Plant Improvements (Stage 1)
- IntroducedJun 16, 2025
- Board of Finance
- Council vote
- Jun 23, 20252025
- Jun 16, 20252025
- PDF2025.06.16 DPW-Water Resolution re Step II CWSRF Loan Authorization123 KB
- PDFBOF-CC Memo WWTF Stage 1 Final Design439 KB
- PDFChecklist_BOF-CC Memo WWTF Stage 1 Final Design128 KB
- PDFSigned CC Resolution Authorization for up to $2,192,700 Step II Loan From Vermont Clean Water State Revolving Fund and for Amended Engineering Contrac1.4 MB
- PDFEngineering Draft Scope of Work256 KB
- PDFStep II Checklist_2025 Board of Finance and City Council128 KB
Related
- PassedEnvironment & energy
Council OKs $8,509,830 state loan for main wastewater plant design work
- PassedStreets & transit
Authorization For Up To $518,600 Step II Loan From Vermont Clean Water State Revolving Fund, For An Engineering Contract With Wright Pierce For Up To $70,000 And For An Amended Engineering Contract With Stantec For An Additional Amount Up To $50,000 For The Upsized Sewer On Cherry Street Project
- PassedEnvironment & energy
Council takes up $1,790,700 state loan for Manhattan Drive stormwater repairs
- PassedEnvironment & energy
Council authorizes up to $2,604,600 state loan for Cherry Street sewer upgrade
- PassedEnvironment & energy
Council OKs $650,000 state loan to study Burlington's water treatment plant
- On the agendaEnvironment & energy
Council authorizes $544,000 state loan for water distribution and storage planning
- PassedMoney & taxes
Authorization For $1,808,000 Construction Loan From Vermont Drinking Water State Revolving Fund For Upgrade Of Distribution System
- PassedStreets & transit
Council authorizes up to $2,033,000 state loan for Cherry Street water main work