Council takes up $1,790,700 state loan for Manhattan Drive stormwater repairs
Official title: Authorization for $1,790,700 Step III Loans from Vermont Clean Water State Revolving Fund and Engineering Services Contract with VHB, Inc. for $103,400 for The Manhatttan Stormwater Outfalls Rehabilitation Project
The Board of Finance brought a resolution to apply for a state clean water loan of up to $1,790,700 to repair three stormwater outfalls in the ravine between Convent Square, Manhattan Drive and Route 127. It also authorizes a $103,400 engineering contract with VHB, which is $7,700 more than before for wetland permit work.
- IntroducedJul 13
- Board of Finance
- PassedJul 13
The resolution was on the council's July 13, 2026 consent agenda; the minutes in the record do not show a vote, and the Board of Finance action is not recorded either.
Who does this affect?
Stormwater customers, who would repay the loan. The memo says the outfalls sit on steep sandy slopes and could threaten Manhattan Drive, Route 127 and nearby private property if left alone.
What does it cost?
Up to $1,790,700 borrowed, repaid over 20 years starting a year after construction ends, with a 2% admin fee. The memo estimates $109,513 a year in debt payments from the Stormwater Fund, with rate increases possible as early as FY29.
When does it take effect?
The documents give no effective date. The memo says the project is ready to move to bidding and construction, and staff would return to the council for approval to sign the construction contract after bids arrive.
- Jul 132026
- Jul 132026
- PDF2026.07.13 DPW Resolution re Manhattan SW Outfall75 KB
- PDF1 - BOF-CC Memo Manhattan SW Outfalls Contract Amendment896 KB
- PDFAttachment A - 59276 Manhattan Drive Amendment 1 Scope_Fee_Appdx_K530 KB
- PDFAttachment B Burlington City RF1-311 CC1 EXECUTED STEP II+III Manhattan Drive Outfall Project with WID Approval 02.28.20252.0 MB
- PDFAttachment C - RF1-311_Burlington_Manhattan_Outfall_Final_Design_APP_LTR_2026-04-151.4 MB
- PDF3 - BOF-CC Checklist_Manhattan Dr SW Outfalls Rehab504 KB
- PDFSigned CC Resolution Authorization For $1,790,700 Step III Loans From Vermont Clean Water State Revolving Fund And Engineering Services Contract With2.0 MB
Related
- PassedStreets & transit
Authorization For Up To $518,600 Step II Loan From Vermont Clean Water State Revolving Fund, For An Engineering Contract With Wright Pierce For Up To $70,000 And For An Amended Engineering Contract With Stantec For An Additional Amount Up To $50,000 For The Upsized Sewer On Cherry Street Project
- On the agendaMoney & taxes
Authorization For Up To $2,192,700 Step II Loan From Vermont Clean Water State Revolving Fund And For Amended Engineering Contract With Wright Pierce For Up To $2,192,700 For Main Wastewater Plant Improvements (Stage 1)
- PassedEnvironment & energy
Council authorizes up to $2,604,600 state loan for Cherry Street sewer upgrade
- PassedEnvironment & energy
Council OKs $8,509,830 state loan for main wastewater plant design work
- PassedMoney & taxes
Authorization For $1,808,000 Construction Loan From Vermont Drinking Water State Revolving Fund For Upgrade Of Distribution System
- PassedStreets & transit
Council authorizes up to $2,033,000 state loan for Cherry Street water main work
- PassedEnvironment & energy
Council OKs $650,000 state loan to study Burlington's water treatment plant
- On the agendaEnvironment & energy
Council authorizes $544,000 state loan for water distribution and storage planning